Home
Build
↓
Built to Suit
Design, Build & Operate
Engineering & Construction
Full EPC project delivery
Store
↓
Cold Storage
Temp-controlled warehousing
3PL Management
Full supply chain outsourcing
Portable Cold Storage
Portable Cold Storage: Overview
View all units & solutions
Reefer Containers
Portable site cold storage
Blast Freezers
Rapid industrial freezing
Super Store
High-volume modular rooms
Super Freezer
Ultra-low -70°C storage
ISO Tanks
Liquid cargo transport
AMC & Spare Parts
24/7 maintenance support
Bhubaneswar
Cold storage facility, Odisha
Dry & Modular
Tunnel Containers
Drive-through dual-door access
Open Top Containers
Open-roof for crane-loaded cargo
Hard Top Containers
Removable steel roof panels
Cold Rooms
Modular walk-in refrigeration
Dry Containers
Standard 20ft & 40ft dry boxes
Office Containers
Portable site office solutions
Dry Fabricated
Prefab cabins & modular rooms
Accessories
Container parts & fittings
Move
↓
Transportation
Pan-India cold chain logistics
Process
↓
Fruits & Vegetables Processing
Pre-cooling, sorting & packing
Blast Freezing
Rapid industrial freezing services
Solve
↓
Custom Solutions
Bespoke cold chain design
Loading Calculator
Find the right container size
Pallet Guide — Reefer
Euro, standard & trolley counts
Pallet Guide — Blast Freezer
Blast freezer pallet configs
Pallet Guide — Super Freezer
Ultra-low temp configurations
Pallet Guide — Super Store
Modular storage pallet guide
Impact
About
Careers
Talk to us
→
Case Studies
Store
Chemical
Case Study
11
Temperature Compliance For A Leading Chemical Manufacturer, Surat
Client
Leading Chemical Manufacturer
Location
Surat, Gujarat
Product
40 ft Reefer Container
The Brief
Challenge
Temperature-sensitive finished goods requiring –6°C or below with no existing sub-zero capability
Compliance and stability risks from inadequate infrastructure
Solution needed to integrate without disrupting active production
Our Approach
Solution
Specialised 40 ft reefer deployed within 48 hours at –6°C or lower
Real-time temperature monitoring with instant alerts
Seamless on-site integration for rapid access
Results
Difference
Zero deviations or spoilage since deployment
Assessment to live operation in 2 days
Need for permanent cold room construction eliminated
Deployment Speed
48 hours
Product Loss
Zero deviations
Temperature Control
≤ –6°C
Client Voice
Testimonial
"This solution delivered stability, speed, and control beyond expectations."
Operations Head
Leading Chemical Manufacturer, Surat
Work With Us
Have a similar challenge?
Talk to our team
All cases