Cold chain infrastructure for a leading quick commerce platform: 3 cities in 90 days
Case Studies
BuildQ-Commerce

Cold Chain Infrastructure For A Leading Quick Commerce Platform: 3 Cities In 90 Days

ClientLeading Quick Commerce Platform
LocationMumbai · Delhi · Bengaluru
ProductModular Cold Chain Infrastructure
The BriefChallenge
  • Standardised cold chain infrastructure needed across multiple cities simultaneously
  • Each site required SLA-ready operations before platform launch in that market
  • No tolerance for variation — every site had to match the same specification
  • Extremely compressed timelines with no room for delays
Our ApproachSolution
  • Designed a modular, replicable cold chain infrastructure template
  • Deployed across three cities in parallel with a central project control team
  • Standardised layouts and pre-approved vendor network ensured consistency
  • Each site commissioned independently and handed over SLA-ready
  • Full documentation and staff training completed before go-live at each location
ResultsDifference
  • All three cities delivered within 90 days per site
  • Identical specification achieved across every location
  • SLA-ready operations from day one at each site
  • Infrastructure template now replicable to 50+ cities
Cities Deployed3
Timeline Per SiteUnder 90 days
SpecificationStandardised
Scalability50+ cities
OperationsSLA-ready day one
Client VoiceTestimonial
"We needed infrastructure that could scale as fast as we do. Crystal built the template and delivered it across three cities without a single miss."
Supply Chain DirectorLeading Quick Commerce Platform
Work With Us

Have a similar challenge?