Case Studies
StoreDairy

Rapid Blast Freezer For A Dairy Company In Maharashtra

ClientMid-Size Dairy Company
LocationMaharashtra
ProductMobile Blast Freezer (30 kW)
The BriefChallenge
  • Existing system inadequate for rising yogurt production demands
  • Traditional blast freezer construction would require 6–8 months
  • Capital-intensive infrastructure expansion not viable for timeline
Our ApproachSolution
  • Mobile blast freezer capable of freezing 2 MT of yogurt per day
  • Deployed within three weeks from consultation to full operation
  • Avoided costly civil construction entirely
ResultsDifference
  • Deployed in 3 weeks vs. 6–8 months for traditional build
  • 2 metric tons of yogurt frozen daily
  • Significant CAPEX savings
Deployment Time3 weeks
Daily Freezing2 metric tons
Time Saved6–8 months